Completed 2007

St. Nicholas at Wade C.E Primary School, Kent - New head teachers office and internal refurbishment

Project Value: £48,000.00
Project Architect: Clague Mr S Gee 01233 624354 
Quantity Surveyors: David Langdon Mr Kevin French 01732 840429
Client: Kent County Council 
Mr Adrian Taylor (Head Teacher) KCC 01843 847253 
Project Commenced: 15/01/2006
Project Completion date: 16/3/2007
BEC Site Manager: Mr Doug Woodcock

BEC are working in Partnership with KHPC with project management being provided from both parties. 

The project consists of, traditional foundations; with brick/block work substructure and a In-Situ Slab Floor, a new Flat roof, Internal Plastering and Finishes to Form the Head masters office and New Store.


brickwork ongoing

Kings Hill Community Centre West Malling Kent - New extension for youth centre & pre school nursery

Project Value: £585,000.00
Project Architect: Clague Mr Lee Batten 01732 897747 
Quantity Surveyors: David Langdon Mr Kevin French 01732 840429
Client: Kings Hill Parish Council Mrs Jill Hodgson 01732 870382

Project Commenced: 7/7/2006
Project Completion date: 23/3/2007
BEC Site Manager: Mr John Verrier

BEC are working in Partnership with KHPC with project management being provided from both parties. 

The project consists of, traditional foundations; with brick/block work substructure and a In-Situ Slab Floor, a new trussed roof with Cedar Shingles, over Tac Tray Roof Supported on a Portal frame. The low level Roof is a Trocal Single Ply membrane, and the Entrance canopy is a Standing seam Zinc Roof. A passenger lift was installed for Disabled use, and all the Doors and Windows were a Kawneer system, with Disabled opening doors to both entrances. External walls are a Forticrete Split Faced Facing Block, with Cedar Cladding. 

Externally a soft play area with fencing was provided for the pre-School Nursery and a new extended Block paved Car Park. 

The project was completed on time and to the Clients Budget.


the project commenced with a ground breaking ceremony with the local children who would be using the facillities

the foundations were poured

brickwork ongoing
 

windows & roof installed

project handover
 

Barton Court Grammar School - Conversion of Sports Hall to form new Library

This is a Negotiated Project following on from the New Food Technology Block currently under Construction.

Project Value: £312,000.00 
Project Architect: Lee Evans Partnership Mr. Jason Davies 01227 784444 
Quantity Surveyors: Betteridge & Milsom Mr.Keith Sandham 01227 471186 
Client:Kent County Council
Mr Adrian Plowman ( Deputy Head Teacher) 
Project Commenced: 15/07/2007
Project Completion date: 30/11/2007
BEC Site Manager: Mr Andy Louch

BEC are working in Partnership with KCC with project management being provided from both parties. 

The project consists of New External Cladding to be an American Kalwall System, New Windows externally, Trespa external Panels. A new mezzanine area, new flooring redecorations, Balustrade and a revised M & E scheme for the Library

 

Barton Court Grammar School - New food technology block

Project Value: £536,353.00 
Project Architect: Lee Evans Partnership Mr. Jason Davies 01227 784444 
Quantity Surveyors: Betteridge & Milsom Mr.Keith Sandham 01227 471186 
Client:Kent County Council Mr Adrian Plowman ( Deputy Head Teacher) 

Project Commenced: 27/11/2006
Project Completion date: 24/6/2007
BEC Site Manager: Mr Andy Louch

BEC are working in Partnership with KCC with project management being provided from both parties.

The Works are a new extension to the existing School consisting of, reinforced Concrete foundations; with brick/block work and a Pre cast first floor and stairs, new Lift, Steel Frame, with Roof and External Cladding, heating Toilets. A Fit out for the New Food Technology Kitchens and It suite and external works to form new playground.

 
 

SANDWICH YOUTH & COMMUNITY CENTRE, SANDWICH, KENT - EXTENSION TO PROVIDE CAFE, KITCHEN, AND OFFICE SPACE

Project Value: £180,000.00
Project Architect: CYMA Architects Mr John Minter 01233 666663
Quantity Surveyors: The Woodleycoles LLP Mr. Chris Norris 01233 740025
Client: Sandwich Council STARR Initiative - Mr Phil Scott 01304 611141

Project Commenced: 5/3/2007
Project Completion date: 27/7/2007
BEC Site Manager:Mr Doug Woodcock

BEC are working in Partnership with STARR with project management being provided from both parties. 

The project consists of, traditional foundations; with brick/block work substructure and a Beam & Block Floor, External facing brickwork walls, with Aluminium Windows and Doors and a new Alwitra Flat roof. 

Internally Plastering to Partitions and new Finishes, with a refurbishment to the existing Youth Club hall, and adaptations to the existing M & E scheme. 

Externally, works to the Car Park and New Retaining walls. 

The scheme has a number of Environmental requirements which have been carefully worked into the project.